INSTRUCTION OF USE AND OPERATION:-
1) Turn on the power supply. Inspect the operation lewer/ between of the shaping machine is it normal?
2) Turn the top cover ( left and right) 90 degree and make the requirements diphagram. Put it between the upper and lower frames and pull down the ball head tie road to clamp it.
3) Reset the top cover and twist the lifting wrench to raise the sleeve to the top. Operating height. (Finite position marbles on the upper spindle)
4) Place packaged products in the middle of the web.
5) Open the heating switch and heat the diaphragm when the diaphragm is heating
1) CM below the lower flame plane
( about two or three minute)
6. Turn off the heating switch, twist the lifting wrench and put down the sleeve, at the same time open the vacuum motor, after packaging and moulding , you can take it off.